St. Peter Hospital


Location: Albany, New York

Role: Project Manager/Owner’s Representative

Project Overview: Campus Wide Reorganization/Expansion Consisting of:
  • 260,000 SF Patient Care Pavilion addition including 24 Operating Rooms on two floors one of which is a Hybrid OR (one of only 29 in the world) a Cysto OR and Robotics OR, 117 patient beds on three floors of Patient Care Units, new Pharmacy, new Endoscopy Suite and a food court
  • 1,500 car parking structure
  • 330,000 SF of renovation between Phases 1 and 3
Central’s original role on this assignment was as part of St. Peter’s Hospital’s “second opinion team”. In this capacity, Central evaluated St. Peter’s expansion plans for feasibility before more in-depth planning began. In part, this required modifying an initial $275 million budget to $245 million; subsequently modifying the plan to a final budget of $258 million. Central’s input helped St. Peter’s overcome design and engineering obstacles and made their massive renovation plan feasible, allowing them to realize their vision.

Our expertise and invaluable input during feasibility, elevated us from the “second opinion team” to the position of project manager. Now as St. Peter’s selected project manager, Central oversees all aspects of the project and acts as liaison to the numerous architects, engineers, contractors and vendors needed to complete the project. This project is currently on budget and schedule and is due to be completed in 2012.